Street Paving Program

GIS · Information Design · Civic

Street Paving Program

Every Street, Mapped and Scheduled

Role
Creative Director · Information Designer
Year
2025
Categories
Civic · Innovation · Enterprise
Tools
Next.js · TypeScript · GIS · OpenStreetMap · Data Visualization

Overview

A roadway capital-program tool for the City of Orange — a live GIS map and schedule of every street, color-coded by status, with fund sources (NJDOT, CDBG, LTPF) and a multi-year timeline. $28.5M programmed across 110 streets.

The Challenge

Residents ask one question — when is my street getting paved? — and the answer lived in spreadsheets and grant paperwork. The work put every street, its status, and its schedule on one map.

Creative Direction

Direction built the program as a map first: black paved, orange programmed, grey not-in-program, over a locally-stored Orange street network — paired with a searchable, sortable schedule by ward, street, and fund source.

Selected Views

A live GIS map of the city — paved, programmed, and not-in-program streets.
A live GIS map of the city — paved, programmed, and not-in-program streets.
Every street, its fund source, and its schedule.
Every street, its fund source, and its schedule.

Outcomes

  • Mapped every street in the city by paving status and schedule.
  • Connected $28.5M in capital work to fund sources and a public timeline.