Architectural Visualization · Animation · Construction Logistics
Manhattan West
Building Over the Yards
- Role
- Creative Director · Visualization Lead
- Year
- 2014–2019
- Categories
- Enterprise · Storytelling · Architecture · Innovation
- Tools
- 3ds Max · Navisworks · After Effects
Overview
Visualization of Manhattan West's South Tower — massing, context, and construction sequencing across the active rail yards and platform. Produced within the AECOM Tishman visualization practice.
The Challenge
Building over live infrastructure demands a clear read of phasing and logistics. The work made the sequence understandable to non-technical stakeholders without diluting the engineering underneath.
Creative Direction
The narrative followed the platform-up logic of the site — establishing context, then revealing how the tower takes shape above a working transportation corridor.